Feature

●Simple structure and timeless design: Only 4 parts of the main body of the vent valve. The simple construction allows you to use it for a long time. The Dolgo vent valve with E-socket consists of 4 parts (valve dome, rubber seal, moving board, valve cylinder), and 2 E sockets (valve socket, rubber ring)
●(Includes E-socket for easy maintenance) A E-socket is included for easy inspection and maintenance, and the ventilation valve body is detachable. Do not disassemble the air vent valve. Except JD-125
●(Drain Port for Ultimate Condensation Prevention) The two drain ports on the valve cylinder allow condensation to be returned within the valve dome into the drainpipe


Description

Trusted worldwide for indoor vent valves

The Dolgo vent valve was the first in Japan in 1983 that enables indoor treatment of drainage ventilation.
There are still no complaints reported over time of product and is proven to last.
We have solved the problem of shortening the production period and building design that was difficult to use with the open air system.
Available in 6 models ranging from 40A to 125A.



From the Manufacturer



Product Features:

1. Simple structure and timeless design

Only 4 vent valve body configurations.The simple construction allows for a long time.

The Dolgo vent valve with E-socket has 4 vents (valve dome, rubber seal, moving board, valve cylinder).

It consists of 6 parts with 2 E sockets (bulb socket, rubber ring).

2. Comes with an E-socket for easy maintenance.

For easy inspection and maintenance, an E-socket is included, and the vent valve body is removable.

Do not disassemble the air vent valve.

Except JD-125.

3. A drain port that is perfect for preventing condensation.

Two drain ports on the valve cylinder allow condensation from the valve dome back into the drain.

Position:

Drainage system and installation locations for Dolgo vent valves are as follows:

1. Top of the expansion vent pipe.

2. Loops vent pipe and top of each individual vent pipe.

3. When installing in a drainage transition pipe, set the number of connected sanitary equipment to be used to 5 units.

When installed at the top of the drain pipe, it is installed at a height of 3.3 ft (1 m) or more than 5.9 inches (150 mm) than the overflow edge of the top level appliance.When installed in a drain transition pipe, the exit position of the vent pipe is installed in the downstream side immediately after connecting the top appliance drain to the draining transition pipe, and at a height of 5.9 inches (150 mm) than the overflow edge of the highest appliance on the floor.

The bottom floor is a separate system.

JDE-40 JDE-50 JDE-65 JDE-75 JDE-100 JD-125
JDE-40 JDE-50 JDE-65 JDE-75 JDE-100 JD-125
Depth: 8.4 8.4 11.8 14.0 17.0 21.2
Width (cm) 8.4 8.4 11.8 14.0 17.0 21.2
Height (cm) 12.1 12.4 14.5 16.4 16.8 15.0
Air Flow (L/s) 17.3 17.7 38.0 48.1 68.4 103.6